News
      Brief Introduction
      Benefits and Scale
      Technology Achievement
      River Close-off and Cofferdam          in Deep Water
     River Close-off and Concrete           Cut-off Wall Construction
     River Close-off on the Divers-           ion Channel
      Concrete Placement
     Fast Concrete Placement
     Phase-III RCC Concrete           Placement
      High Slopes
     Construction of Ship lock
     Metal Structures of Ship lock
      Generating Units
     Environment  Protection
      History
      Owner of TGP
      FAQ
      Exhibition Hall
      Gallery

River Close-off on the Diversion Channel

It was not easy to hold steady the fill material on the slippery riverbed formed with artificial concrete during the river close-off on the diversion channel. And it was even more difficult than that on the main channel since the inflow of 10300 m 3 /s, the water fall of 4 meters, and water running speed of 7 m/s were bigger. The constructors applied steel-framed rock cages and alloy steel nets to roughen the bottom and to increase the friction of the riverbed, so that rock barrier was formed to reduce the difficulty of close-off and to ensure the stability of the fill materials. Two parallel levees were built to take the water fall of the diversion channel, the upstream
levee holding 2/3 of the water fall, the downstream one holding 1/3. On 6 November 2002, the TGP diversion channel was successfully closed off. The event was then selected as one of the top 10 science and technology advancement news in 2002 sponsored jointly by China Science Academy and China Engineering Academy.
China Three Gorges Project ©2002 All rights reserved
¶õICP±¸05010722ºÅ