News
  Brief Introduction to TGP
  Benefits and Scale of TGP
  Significant Technology Achievement in the      TGP Construction
  River Close-off and Cofferdam in Deep       Water
River Close-off and Concrete Cut-off Wall       Construction
River Close-off on the Diversion Channel
  Concrete Placement on the TGP Dam
Fast Concrete Placement Technology
Phase-III RCC Concrete Placement
  High Slopes outside the Three Gorges Ship      lock and Metal Structures
Construction of High Side Slope of Three       Gorges Ship lock
Metal Structures of Ship lock
  The Design, Manufacture and Installation of      the Units
  Three Gorges Project and Environmental      Protection
  History of Three Gorges Project
  Owner of Three Gorges Project
  Frequently Asked Questions & Answers
  Exibition Hall
  Pictures Collection

River Close-off on the Diversion Channel

It was not easy to hold steady the fill material on the slippery riverbed formed with artificial concrete during the river close-off on the diversion channel. And it was even more difficult than that on the main channel since the inflow of 10300 m 3 /s, the water fall of 4 meters, and water running speed of 7 m/s were bigger. The constructors applied steel-framed rock cages and alloy steel nets to roughen the bottom and to increase the friction of the riverbed, so that rock barrier was formed to reduce the difficulty of close-off and to ensure the stability of the fill materials. Two parallel levees were built to take the water fall of the diversion channel, the upstream levee holding 2/3 of the water fall, the downstream one holding 1/3. On 6 November 2002, the TGP diversion channel was successfully closed off. The event was then selected as one of the top 10 science and technology advancement news in 2002 sponsored jointly by China Science Academy and China Engineering Academy.

China Three Gorges Corporation ©2002 All rights reserved